Also In This Album

My Post Pictures (25) »
Jesse Open September 1, 2020
A little side shot from 1979, USI Clearing Detroit Service Center Back in the heavy machine repair, sweat shop days. The iron link was heated with a ring burner for four hours. The two bronze half bushings were packed in dry ice at the same time. We lowered the bronze into the housing on tongs hung below the crane. Four or five men with maple blocks and 5 pound rawhide hammers would drive the bushings home together very evenly. You had one shot at it. Get it skewed and we were screwed.

More About This Picture

Vehicle

N/A

Location

N/A

Keywords

N/A

Discover More Pictures

See More
Advertisement

Comments (0)

Please Register or log in to leave a comment.

Be the first to comment on this picture!

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.